At this point, the chafing chain is lifted into the bow chock and then to the bow chain stopper to be secured under the direction of the pilot.
Mooring and unmooring operations are quick and oftentimes all connection points are equipped with quick-release mechanisms not to be confused with quick-release hooks.
Defective lines shall not be used.