Kuala Lumpur City Hall DBKL said that it was due to signs of soil movement affecting the structure of the building.
The proposed action should be brought for discussion with Ikram for the direction of the proposed solution related to the landslide.
A check by The Star saw two lorries carrying construction materials in the area, believed to be for strengthening works.
Even their house TNB and Water bill.
REACHED 2,000,000 HITS TODAY - 20 JANUARY 2012.
According to the Kuala Lumpur City Hall, the defects were found by the Public Works Department PWD and the Malaysian Institute of Public Works Ikram during checks on the building.